Maintenance Resources Optimization Using Pareto Analysis: Instrumentation Air Compressor in Oredo, Nigeria

Maintenance Resources Optimization Using Pareto Analysis: Instrumentation Air Compressor in Oredo, Nigeria

Gregory Omozuhiomwen Egbe, Stella N. Arinze, Solomon H. Ebenuwa, Emenike Raymond Obi, Augustine O. Nwajana
DOI: 10.4018/IJMMME.353392
Article PDF Download
Open access articles are freely available for download

Abstract

Managing resource allocation for optimum effectiveness at various levels of maintenance activities is always a challenging task. Optimizing maintenance resources enables an organization to set priorities towards achieving certain goals which are availability and reliability of the equipment for operational excellence. The purpose of this analysis is to determine the optimum resources allocation proportions among the failure modes and to identify the failure modes that have the greatest cumulative effect on the equipment's downtime. This paper presents a methodology using the Pareto analysis in conjunction with failure mode effect and criticality Analysis in maintenance resources optimization. The approach is based on ensuring all failure mode criticality number are considered to obtain the significant failures mode that you should focus on as a priority. The analysis shows that failure mode; FM5, FM 3, FM 2, FM 12, FM 7 and FM 13 are confirmation to the Pareto principle, identifying that most of the downtime of the Instrumentation Air Compressors originated from these failure modes.
Article Preview
Top

1. Introduction

Maintenance resources optimization consists of the development and analysis of mathematical models aimed at improving or optimizing maintenance resources allocation. Resource allocation is a critical task in the oil and gas industries. Effectively allocating resources is critical to the success of any project or initiative. Resource allocation is the process of assigning and managing resources to meet equipment maintenance requirements and achieve organizational goals which is availability and reliability of these equipment. It involves balancing the needs and constraints of the project with the resources available. Resource allocation can be a complex task in maintenance activities, and organizations need to have a systematic approach to ensure that they allocate resources effectively.

Complete Article List

Search this Journal:
Reset
Volume 13: 1 Issue (2024)
Volume 12: 4 Issues (2022): 1 Released, 3 Forthcoming
Volume 11: 4 Issues (2021)
Volume 10: 4 Issues (2020)
Volume 9: 4 Issues (2019)
Volume 8: 4 Issues (2018)
Volume 7: 4 Issues (2017)
Volume 6: 4 Issues (2016)
Volume 5: 4 Issues (2015)
Volume 4: 4 Issues (2014)
Volume 3: 4 Issues (2013)
Volume 2: 4 Issues (2012)
Volume 1: 4 Issues (2011)
View Complete Journal Contents Listing